Description :
The East Headworks will provide preliminary treatment for a peak flow of 360 MGD. This contract is part of the overall wet weather plant expansion and will generally include the following:
- Modification of the Main Pumping Station to direct flows to the East and West Headworks facilities
- 120-inch diameter conduit between the Main Pumping Station and the East Headworks
- Six (6) mechanically cleaned bar racks and screenings conveying
- Six (6) aerated grit tanks, grit pumping, concentrating and classifying equipment
- Operations area that includes a control room, locker room, and break area
- Removal of the West Headworks venturi flow meter.
- Replacement of the 120-inch diameter primary influent conduit
- East, West and Center Primary Influent Conduits
- Upgrade of the Headworks Odor Control System
- Modification of existing below grade pipe galleries
- Various modifications to the existing West Headworks
The contract drawings and specifications will be bid using these disciplines: Contract 1729G: General Construction, Contract 1729E: Electrical, Contract 1729H: Heating, Ventilating and Air Conditioning (HVAC), and Contract 1729P: Plumbing
AWARDEES:
GENERAL ~ PJ Dick ~ $78,474,915.00
ELECTRICAL ~ Kirby Electric, Inc. ~ $5,698,000.00
PLUMBING ~ SSM Industries, Inc. ~ $934,000.00
H-VAC ~ SSM Industries, Inc. ~ $1,985,000.00