Status:
Planned
Type:
Construction
Planned Date:
May 2021

Melanchton Pump Station Replacement

Project number : 1746
Description : This contract is for the replacement of the existing Melanchton Ejector Station with a conventional wet well pump station at the same location of Melanchton and Blair Streets. The work will include the demolition of the existing ejector station, installation of a new wet well, pumping equipment, meter vault and control panel enclosure.
Documents: