Remove existing roofs from Screenings Garage (approx. 2,100 square feet) and Power Generation Building (approx. 12,000 square feet), and install new TPO roofs with insulation. Additional work includes maintenance-type repair to areas on the Built-up Roof system for the Dewatering Building.