Status:
Planned
Type:
Construction
Planned Date:
February 2021

Electrical Distribution System Upgrade

Project number : 1739
Description :

The Electrical Distribution System Upgrade contract will generally address the following items with respect to the plant wide electrical distribution system upgrade:

  • Coordination with Duquesne Light Company for removal of existing 5KV main substation
  • Construction of a new 5KV main substation
  • Replacement of the switchgears, substations and MCCs in the Energy Recovery Facility, Compressor and Effluent Flushing Water pump station buildings
  • Removal of the 5KV substations from Administration Annex building and the Rack & Chlorination building and installation of an alternate 480V feed source for the existing loads
  • Installation of electrical duct banks, as required, for both electrical and communication cabling