Description: The program will advance the work performed by the Preliminary Planning team to advance the Near Surface Facilities included in Package 6 of the ART project, consolidation sewers, regulators, outfall, abandonment of existing facilities, and connections to existing sewers to a final design in coordination with the proposed development of the north shore of the Allegheny River between Sharpsburg and Aspinwall particularly Allegheny Shores and previously referred to as Riverfront 47.