What is the GROW Program?

The GROW program is an essential part of ALCOSAN’s plan to create cleaner waterways. In 2016, ALCOSAN created the Green Revitalization of Our Waterways (GROW) program. It was designed as a system-wide effort to reduce excess water from entering an already overloaded sewer collection system.


GROW is a multi-million-dollar grant program that provides funding for source reduction projects in our partner communities and authorities. Under the program, any municipality or municipal sewer authority within the ALCOSAN service area is eligible to submit a source control project for grant funding consideration.

Benefits

  • Addresses the community’s concerns about including green infrastructure.
  • Creates collaboration between ALCOSAN and our partner municipalities.
  • Reduces excess rainwater from entering the sewer system and contributing to overflows.
  • Protects and conserves our area’s natural resources.

Eligible Project Types

  • Removing streams from the sewer system (direct stream inflow removal).
  • Managing storm runoff by installing nature-based solutions that absorb and filter rainwater (green stormwater infrastructure).
  • Providing maintenance on cracked or broken pipes to reduce water from seeping in and entering the system (infiltration/inflow reduction).
  • Dividing a combined sewer system by adding another pipe that only carries wastewater and the original pipe will only carry rainwater (sewer separation).
  • Performing maintenance on related infrastructure to ensure it is working at the highest capacity (system optimization).

Since 2016, nearly 85% of ALCOSAN’s customer municipalities have participated in the GROW program. GROW has provided $77 million in grant funding towards approximately 203 projects that will reduce sewer overflow by an estimated 237 million gallons per year. 

When and How to Apply

Any municipality or municipal sewer authority within the ALCOSAN service area is eligible for GROW grants. New grant cycles typically begin in the fall season.  ALCOSAN will schedule information meetings before each cycle to assist municipalities with the application process. Application documents are available via the municipal portal. 

Have questions regarding the GROW program at ALCOSAN?

Contact Us

GROW Grant Recipients and Projects 

2027 GROW Program Grant Offers - Cycle 13

SO: System Optimization • SSep – Sewer Separation • I/I – Infiltration and Inflow

Municipal PartnerProject DescriptionGROW Grant Received
Bridgeville Borough System Optimization (SO) - McLaughlin Run Work Area 1. The sewer overflow reduction project includes the re-routing of existing sewer infrastructure via the installation of new sanitary sewer and manholes along Baldwin Street.$657,591
Bridgeville Borough Sanitary Sewer Lining (I/I) - McLaughlin Run Work Area 4. Sanitary sewer lining of over 4,000 linear feet of sanitary sewers in residential areas between Chartiers Park and McLaughlin Run Park. $244,789
McKees Rocks BoroughSewer Separation (SSep) - C-09 Storm Sewer Separation Phase 2. This phase of a larger stormwater separation project will install new separate storm sewers, inlets, and manholes along Chartiers Avenue, Metber Alley, and Mary Street.$2,548,927
O’Hara TownshipSanitary Sewer Lining (I/I) - A-72 Valley View Sanitary Sewer Lining Project. Sanitary sewer lining of over 2,600 linear feet of sanitary sewers in several residential areas adjacent to Kerrwood Park.$131,750
Turtle Creek BoroughSewer Separation (SSep) - T-10 Storm Sewer Separation Project. A stormwater separation project including new separate storm sewers, inlets, and manholes along Albert Street, Maple Avenue, James Street, George Street, Mercer Street, and Locust Street.$1,380,864
West View Water AuthoritySewer Separation (SSep) - Cemetery Lane CSO Sewer Separation Project. A stormwater separation project including new separate storm sewers, inlets, and manholes along Oakwood Avenue, State Alley, and Beechmont Avenue as well as an area near Frankfort Avenue and Center Avenue.$1,690,000

Green Stormwater Infrastructure Guidance Documents

ALCOSAN is committed to taking a proactive approach to stormwater management. ALCOSAN and its customer municipalities and authorities have completed significant work throughout the service area to understand the scope and challenges of preventing extraneous source flow from entering the Regional Conveyance System. Building on these efforts, ALCOSAN created guidance documents to support the successful implementation of Green Stormwater Infrastructure (GSI).  This document is intended to provide guidelines for private and public entities in constructing GSI, from initial planning stages to post-construction maintenance.  

Green Stormwater Infrastructure and Source Control Monitoring Guide

This document provides guidance to facilitate successful performance monitoring of source control projects implemented to reduce inflow into the regional collection system within the ALCOSAN service area. It is intended to be used by ALCOSAN, municipalities, and municipal sewer authorities in planning for, developing and implementing monitoring plans for projects funded under ALCOSAN’s Green Revitalization of Our Waterways (GROW) grant program.

Quick Links

GROW Program

GROW Program Press Releases

Documents in PDF format

GROW Cycle 11

GROW Cycles Archive