Blue Header

 

Article List

ALCOSAN Continues Analysis for Clean Water Plan

June 1, 2018 – The Allegheny County Sanitary Authority (ALCOSAN) will be conducting its second round of technical analysis in preparation for a massive improvement plan for cleaner, healthier rivers and streams in the region.

Beginning on Monday, June 4, contractors will be conducting geotechnical testing at various sites in Pittsburgh, Etna and Sharpsburg. A total of 30 borings will be conducted through August. Last year, the same type of testing was conducted in 12 places in Pittsburgh, Rankin and McKees Rocks.

Borings will be made to assess the condition of the soil and rock, gather information on the level and amount of groundwater and obtain an understanding of the subsurface conditions that could influence future plans.

Drill rigs and support vehicles will be present, with traffic controls in place in locations where the public has access. The locations have been selected to minimize the impact on residents and businesses, and contractors will maintain access for local traffic to any affected driveways and sidewalks.

Operations typically run from 8 a.m. to 6 p.m., and the work should take one to two weeks in each location. All personnel will wear ALCOSAN safety vests.

While the process is fairly quick and every effort will be made to keep disruption to our neighborhoods minimal, this process can be noisy as the drill rigs bore through the ground.

Once the borings are complete, monitors will be put into place, and they will be checked periodically, but the rigs and support vehicles will be on the sites only temporarily.


ALCOSAN Continues Analysis for Clean Water Plan Download

Sewer Overflow Advisory key: Wet Weather overflows have ceased. Rivers, streams and creeks may still be impaired. For more information: http://www.alcosan.org/SewerOverflowAdvisories/SewerOverflowAdvisoryKeySOAK/tabid/114/Default.aspx

Customer Care at ALCOSAN, we believe it's our duty and privilege to protect, recover and reuse our most valuable resources for the benefit of our customers.

Consent Decree: To comply with provisions set forth in the Clean Water Act, ALCOSAN must meet a series of requirements for planning, design and construction, operation and permitting. For more information http://www.alcosan.org/WetWeatherIssues/ConsentDecree/tabid/63/Default.aspx

Watershed Education: Leave small leftovers of paint and solvents to dry rather than pouring them down the drain. Learn more http://www.alcosan.org/Portals/0/PDFs/WhatCanUDo_Brochure_bled.pdf

Contact   |   News   |   Events   |   Consent Decree   |   Careers   |   Sitemap

All content © Copyright Allegheny County Sanitary Authority

3300 Preble Avenue
Pittsburgh, PA 15233
(412) 766-4810