bluebox

OPEN HOUSE 2019
Treatment Plant / Laboratory Tours

PLANT TOURS

The 45-minute bus tour of the plant will cover the primary and secondary operations, solids process, energy recovery facility and outfall where approximately 156,000 gallons of purified wastewater is discharged into the Ohio River each minute. Tours depart every 15 minutes but fill up quickly – we recommend that you get your tickets at the tour ticket booth when you arrive. Event registration does not include tour tickets.

LABORATORY TOURS

A 30-minute walking tour of the Lab provides an overview of the types of tests performed and the equipment used for analytical research. This tour is designed for both technical and non-technical audiences and is offered at 10 a.m., noon, 2 p.m. and 3:30 p.m. No tickets are required but space is limited.

Sewer Overflow Advisory key: Wet Weather overflows have ceased. Rivers, streams and creeks may still be impaired. For more information: http://www.alcosan.org/SewerOverflowAdvisories/SewerOverflowAdvisoryKeySOAK/tabid/114/Default.aspx

Customer Care at ALCOSAN, we believe it's our duty and privilege to protect, recover and reuse our most valuable resources for the benefit of our customers.

Consent Decree: To comply with provisions set forth in the Clean Water Act, ALCOSAN must meet a series of requirements for planning, design and construction, operation and permitting. For more information http://www.alcosan.org/WetWeatherIssues/ConsentDecree/tabid/63/Default.aspx

Watershed Education: Leave small leftovers of paint and solvents to dry rather than pouring them down the drain. Learn more http://www.alcosan.org/Portals/0/PDFs/WhatCanUDo_Brochure_bled.pdf

Contact   |   News   |   Events   |   Consent Decree   |   Careers   |   Sitemap

All content © Copyright Allegheny County Sanitation Authority

3300 Preble Avenue
Pittsburgh, PA 15233
(412) 766-4810